Insert or retrofit
A new system can sometimes be fitted into the existing opening. Water management and compatibility with the building decide whether this is appropriate.
Window Replacement
Assess the opening first. The right method — insert, retrofit or full replacement — depends on the building, not the catalogue.
Inspection first
Window replacement starts with the condition of existing openings, frames, seals and surrounding construction. An insert, retrofit or full replacement may suit different situations depending on water management, access, desired performance and compatibility with the building. A site assessment is needed before choosing a method.
Signs
These are prompts to book an assessment, not remote diagnoses. Each needs to be seen in person.
Rotting frames, failed seals, draughts or water ingress around the opening.
Windows that stick, bind or no longer latch cleanly.
The room stays too hot, too cold or noisier than you would like.
Old single-pane windows are a common prompt to investigate double glazing.
Methods
Both approaches have a place. The deciding factors are measured on site.
A new system can sometimes be fitted into the existing opening. Water management and compatibility with the building decide whether this is appropriate.
Removing the existing frame opens the wall finish and allows a new system and improved sealing. More invasive, but more room to fix underlying issues.
Access, opening condition, strata or approval constraints, operation, glass and your priorities are recorded before any method is recommended.

On site
Condition, access and surrounding finishes are recorded before any option is compared. The scene above reflects the context a site survey captures.
Assessment in context
The existing opening, the proposed system and the finished junction are considered together before a method is chosen.
An assessment can record opening condition, access, surrounding finishes and the problem to solve before options are compared.
Insert, retrofit and full replacement meet the existing frame and water-management details differently; the site evidence guides the comparison.
The connection between a new frame and the surrounding wall is part of the system, so installation details are reviewed with the opening.
Process
You describe the windows, the building and what needs to change.
Each opening is inspected and measured on site.
Glass, frame, hardware and finish are documented for your sign-off.
Works are completed and you receive operating and care information.
Common questions
Disruption depends on access, the number of openings and the surrounding finishes. Your assessor can set expectations for your property before work starts.
Often yes, but the fit depends on water management, access, condition of the surrounding structure and the chosen system. The correct method is decided on site.
Every opening is measured and its condition, access and finishes recorded. This evidence drives the specification and the quote.
Your postcode, the approximate number of openings, what currently bothers you about them and any strata or approval constraints you already know about.
Next step
Tell us about the openings and the problems. The conversation starts with your building, not with a price.
Explore further